When the high-speed rail has not yet been built in large numbers, many people will travel by train. The train needs to follow a predetermined track. Generally, the rails of the train are connected by
Railway Dowty Retarder brakes large, in line with the Ministry; no mushroom head, will not top; adapt to all kinds of old and new lines; never had collision and derailment. TDY203 short Dowty Retarder
Newly activated, long-term deactivated or potentially damp railway tamping machines should measure insulation resistance before use.
The rail tamping machine operator must be trained and qualified to take the job. Strictly follow the gasoline engine manual and the machine instruction manual for maintenance, and add fuel and lubrica
China Earthquake Administration and China Railway Corporation signed a strategic cooperation agreement on high-speed railway earthquake warning in Beijing on the October, 23rd.
As our country's economic strength continues to grow, infrastructure is constantly being built, and high-speed rail is part of it.
©Shandong China Coal Import & Export Co., Ltd. © 2017
Address: No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor: Zhang Wen / Editor: Linda Zhang